Projects

PROJECT PORTFOLIO

JFC Past Performance Projects

MLCB Barstow

Relocation of Dog Training Center

Loma Linda University

Excavation and backfill of 1800 lineal feet, 10 ft wide trench 12 - 24ft deep for chiller pipes

NIB Coronado

Saw cut, asphalt formed, set anchor bolts, and poured concrete for footings in a 60,000 sq ft structure

MLCB Barstow

Completed irrigation system

City of Alpine

Grading of Midway Drive

Pain Field

Erection of 68,100 sq ft corporate hanger

USA Contracting

Erection of 80,000 sq ft pre-engineered metal building

Aria Casino

Staining of all front end concrete

Freemont Experience Las Vegas

80,000 square feet of floor epoxy for entire area

UNLC Samboyd Stadium

Coasted and stained all concrete for stadium

Trust and Worth

Our Clients